Launch Complexes 21-22
Systems
Other Programs
Cost:
$1,199,603
Launch Complex Highlights
- 1956 - Construction started by the
U.S. Army Corps of Engineers
- 26 February 1957 - Air Force accepted Launch
Complex 21/22 (soft pads)
- Van parking behind the sandbag
revetment was used to launch the missiles. A
periscope behind the revetment provided a visual
check of the pad
- 1958 - The blockhouse, underground utility room
and underground cable trenches from the blockhouse
to utility room and on to the Pads completed
- 13 March 1957 to 5 December 1958 - Total of 5
dummy and 15 live Bull Goose launched
- 13 March 1957 - First dummy Bull Goose launched from Launch Complex 22
- 5 December
1958 Last dummy Bull Goose launched from Launch Complex 21
- Total of 5 dummy Bull
Goose
were launched, 2 from Launch Complexes 21 and 3 and from
Launch Complex 22
- 27 June 1957 to 28 November 1958 - Total of 13
live Bull Goose launched from Pad 22 (soft pad)
- Two live Bull Goose were launched
from Launch Complex 21
- 1959 to 1960 - Launch Complex 21 rebuilt.
Facilities included two hardened launch pads, new
control building next to the pads and support
facilities. Control building was the launch control
center for the Mace
- 12 February 1960 - Pad 21-1 (southern cell) and
21-2 northern cell (hard pads)completed for
Mace
- 29 October 1959 to 24 June
1960 - Total of 7
Mace A launched from Pad 22. No Mace was launched
from Launch Complex 21 soft pad
- 11 July 1960 - First Mace A launched from Pad
21-1 (hard site)
- 21 October 1960 - First Mace A launched
from Pad 21-2
- 7 March 1961 - First Mace B launched from Pad
21-1 (hard site)
- 16 March 1961 - First Mace B launched from Pad
21-2
- A total of 44 Mace A and Mace B
winged cruise missile launched from Launch Complexes 21
and 22
- 8 November 1962 - Last Mace A launched from Pad
21-1
- 17 July 1963 - Last Mace B launched from Pad 21-1
- 1964 - Complex vacated
- 2 November 1970 - Reassigned to U.S. Army for use as
a Dragon missile range. Two
launchers were proposed. Army dropped the idea and
returned complex to Air Force on 23 July 1971
- Early 1970's - Launch complex deactivated
- Blockhouse served as a storage
building for the Delta program equipment. Later as a
storage/armory for the U.S. Coast Guard
- Computer Science Raytheon
utilized the Control Building for storage